Silkeborg Varme A/S, Denmark
CAT, together with Midroc Automation, are running a project in Silkeborg with flue gas coolers, heat pumps, boiler and accumulators. The equipment is connected to two gas turbines of approximately 100 MW each.
CAT, together with Midroc Automation, are running a project in Silkeborg with flue gas coolers, heat pumps, boiler and accumulators. The equipment is connected to two gas turbines of approximately 100 MW each.
Östkraft Produktion A/S has rebuilt boiler from coal to biomass, at the same time a flue gas condensation system was incorporated from CAT. Boiler power
Boiler power about 95 MW with peat and biomass. The plant was ready 2015.
HCL scrubber system was ready 2011.HCL scrubber system was ready 2011.
Boiler power about 2 x 90 MW with biomass, recycled and coal . The plant was ready 2010.
Phone +46 31 150 850
info@cleanair.se
Visiting address
Clean Air Technologies Int AB
Kilsgatan 10
41104 Göteborg
Postal address
Clean Air Technologies Int AB
Box 820
211 65 Malmö
Sweden