
Skellefteå, Sweden
Boiler power about 95 MW with peat and biomass. The plant was ready 2015.
Boiler power about 95 MW with peat and biomass. The plant was ready 2015.
HCL scrubber system was ready 2011.HCL scrubber system was ready 2011.
Boiler power about 2 x 90 MW with biomass, recycled and coal . The plant was ready 2010.